Industrial Area 13, Sharjah & Al Saqr Business Tower, Dubai, UAE

A turnkey restaurant fit-out in the UAE is a single-contract project where one contractor delivers your complete restaurant space -- from approved design drawings to DM, DCD, and DEWA sign-offs -- so you receive a fully compliant, ready-to-trade premises. Make My Restaurant manages every stage under one agreement: concept design and 3D visualization, MEP engineering (including commercial kitchen ventilation, grease traps, and gas lines), custom joinery and fit-out works, procurement of catering equipment, and all regulatory submissions to Dubai Municipality, Dubai Civil Defence, DEWA, DM Food Safety, and your landlord or master-developer NOC. You deal with one team, one schedule, and one fixed scope -- eliminating the coordination risk that delays and over-runs most multi-contractor restaurant projects across Dubai, Sharjah, and the wider UAE.

Planning a restaurant in Dubai? See our dedicated restaurant fitout in Dubai service.

Design and BoQ

Concept layouts, 3D renders, and a fixed bill of quantities before any work begins on site.
Read More

MEP and Kitchen Engineering

Full MEP drawings, commercial kitchen ventilation, grease traps, gas lines, and fire-suppression systems installed and certified.
Read More

Joinery and Civil Works

Custom counters, bar fronts, ceiling features, tiling, and all civil finishing to approved architectural drawings.
Read More

Authority Approvals and Handover

We submit to DM, DCD, DEWA, DM Food Safety, and master-developer NOC, then hand over completion certificates on day one.
Read More

Why Choose Us

One contract, one project manager, zero gaps -- here is what sets Make My Restaurant apart.

Approvals Expertise

We handle DM architectural, DM Food Safety, DCD fire and life safety, and DEWA low-voltage submissions concurrently -- not sequentially -- cutting weeks off your timeline.

Fixed-Price Contract

Scope and price are locked after the BoQ stage; no surprise variations once groundwork reveals hidden MEP conditions.

UAE-Wide Delivery

Licensed to operate in Dubai, Sharjah, and all seven emirates -- including free-zone authorities such as DDA, Trakhees, and JAFZA.

F&B-Only Focus

We do not build offices or villas -- every project manager, draughtsman, and site engineer specialises in food-and-beverage spaces.

Process

Three structured stages take you from signed contract to trading permit -- typically in 8 to 14 weeks.

01

Design and BoQ

Concept design, authority pre-check, final BoQ, and contract sign-off within two to three weeks.
02

Build and MEP

Civil works, MEP installation, kitchen fit-out, and joinery executed concurrently with live authority submissions.
03

Approvals and Handover

DM, DCD, DEWA, and Food Safety inspections coordinated; completion certificates and keys delivered on handover day.

Good to Know

Answers to the questions restaurant owners ask us most.

1: How long does a turnkey restaurant fit-out take in Dubai?
Make My Restaurant

Most Dubai restaurant fit-outs we deliver run 8 to 14 weeks from contract to handover, depending on size and fit-out complexity. Mall units with landlord approval requirements typically sit at the longer end. We compress timelines by submitting to Dubai Municipality, DCD, and DEWA concurrently rather than sequentially, which alone saves three to four weeks on a standard project.

2: Which government approvals does Make My Restaurant handle on our behalf?
Make My Restaurant

We manage every required submission: Dubai Municipality architectural and MEP approval, DM Food Safety kitchen-plan review (including ventilation, grease trap, and HACCP layout), Dubai Civil Defence fire and life safety certification, DEWA low-voltage electrical sign-off, and your landlord or master-developer NOC. Free-zone projects (DDA, Trakhees, JAFZA, Emaar, Nakheel) are equally in scope.

3: Is the fit-out price fixed or can costs increase after work starts?
Make My Restaurant

We issue a detailed bill of quantities before any work begins and lock the project price at contract stage. Variations only arise if you change the approved scope after sign-off. This is a deliberate policy: we survey the shell-and-core condition and flag all concealed MEP risks during the design phase so there are no on-site surprises that inflate your budget.

4: What is included in a Make My Restaurant turnkey fit-out package?
Make My Restaurant

The package covers concept design and 3D visualization, full architectural and MEP drawing sets, all civil and finishing works (flooring, walls, ceilings, partitions), custom joinery, commercial kitchen engineering (ventilation, exhaust, grease traps, gas lines, fire suppression), catering equipment procurement and installation, FF&E, all authority submissions and inspection management, and final handover with completion certificates. Signage and soft-furnishings can be added as optional scopes.

5: How much does a turnkey restaurant fit-out cost in Dubai?
Make My Restaurant

Restaurant fit-out costs in Dubai typically range from AED 400 to AED 900 per square foot for mid-range concepts and AED 900 to AED 3,500-plus for premium or fine-dining builds. The range reflects finishes quality, MEP complexity, kitchen specification, and custom joinery. Make My Restaurant issues a fixed bill of quantities after the design stage so your cost is locked before any groundwork starts.

6: What is the difference between a turnkey fit-out and a standard fit-out contract in the UAE?
Make My Restaurant

A standard fit-out contract covers construction only -- you separately appoint a designer, MEP consultant, kitchen supplier, and authority runner. A turnkey contract consolidates all of those under one agreement, one fee, and one accountable project manager. This removes the coordination gaps between trades that cause most UAE restaurant project overruns and delay permit sign-offs.

7: Do free-zone restaurants in Dubai need the same approvals as mainland outlets?
Make My Restaurant

Free-zone F&B outlets follow the authority of their specific zone rather than Dubai Municipality. DDA governs Dubai Design District venues, Trakhees covers JAFZA and Palm Jumeirah commercial, and Emaar Community Management applies to Downtown and Dubai Hills. Make My Restaurant holds experience across all major free-zone authorities and submits to the correct body from the outset, preventing the delays caused by submitting to the wrong regulator.

8: What is a DM food safety kitchen-plan review and why does it matter?
Make My Restaurant

Dubai Municipality Food Safety section reviews your commercial kitchen layout separately from the architectural permit. Inspectors check ventilation airflow rates, grease trap sizing and access, HACCP workflow zoning (raw, cooked, wash), and handwash basin positions. Failure at this review is one of the most common causes of fit-out delays in Dubai. Make My Restaurant designs kitchens to DM Food Safety standards from day one to avoid re-submission cycles.

9: Can you manage both the landlord NOC and the government permit submissions at the same time?
Make My Restaurant

Yes. We prepare the full technical drawing package required by mall management or private landlords -- including branded fit-out concept boards and MEP schematics -- and submit that in parallel with our DM, DCD, and DEWA applications. Running both tracks concurrently rather than sequentially typically saves three to five weeks on the overall project programme.

10: What MEP systems are covered under the turnkey scope?
Make My Restaurant

Our MEP scope covers low-voltage electrical distribution and DB boards, DEWA service connection coordination, commercial HVAC and kitchen makeup air, exhaust and grease-extract ductwork, gas piping and detection systems, fire suppression over cooking equipment (Ansul or equivalent), fire alarm loop integration, cold and hot water plumbing, and grease trap installation. All systems are commissioned and sign-off certificates handed over on completion day.

11: What happens if hidden MEP conditions are found after work starts on site?
Make My Restaurant

We conduct a detailed shell-and-core survey before issuing the BoQ and flag all concealed MEP risks in writing. If a condition genuinely could not be identified pre-contract, we raise a formal variation notice before any remedial work proceeds. Our fixed-price model means no unilateral cost additions -- every change must be agreed in writing before it is executed.

12: Do you handle catering equipment procurement as part of the turnkey scope?
Make My Restaurant

Yes. Equipment procurement, delivery scheduling, installation, and commissioning are included in our standard turnkey scope. We work with UAE-based catering equipment suppliers and specify only models with local service agents so your warranty support is accessible. DM Food Safety inspection of the installed kitchen equipment is also coordinated as part of handover, so you receive a compliant, operational kitchen on day one.

Get in Touch

Start Your Conversation

Reach us anytime — let's plan your restaurant.

    ×

    Loading...