Industrial Area 13, Sharjah & Al Saqr Business Tower, Dubai, UAE

A great commercial kitchen in the UAE channels raw ingredients through a single unidirectional flow — raw receipt, cold storage, prep, cooking, plating, dispatch — with zero cross-contamination and full Dubai Municipality sign-off at every stage. Make My Restaurant delivers end-to-end commercial kitchen design across all seven emirates: space zoning, HACCP-compliant layouts, SS 304 stainless steel fabrication, MEP coordination, and full Dubai Municipality drawing submissions. From a 28 sqm cloud-kitchen shell to a multi-station fine-dining brigade, our certified designers translate your menu into a code-ready, throughput-optimised floor plan — then stay on-site through final DM and Civil Defence inspection.

HACCP Zoning Layout

Physically segregated raw, prep, cooking, and ready-to-eat zones meeting UAE Food Code unidirectional workflow mandates.
Read More

DM Drawing Package

Full municipality-submission drawings: floor plan, reflected ceiling, MEP schematics, and ventilation schedule included as standard.
Read More

Ventilation and Exhaust Design

Exhaust stacks sized 2 m above roofline, electrostatic precipitators, carbon filters, and make-up air — Civil Defence compliant.
Read More

Equipment Schedule and Procurement

Brand-neutral equipment schedule matched to your menu volume, with SS 304 specification and 150 mm clearance built in.
Read More

Why Choose Us

MMR combines design authority with on-the-ground UAE regulatory experience across Dubai, Sharjah, and all five northern emirates.

Multi-Emirate Approvals

We handle DM, Sharjah Municipality, and Abu Dhabi ADAFSA submissions — one team, all emirates, no third-party chasing.

Fixed-Timeline Delivery

Design-to-handover milestones agreed in writing; Civil Defence inspection scheduled before your fit-out crew mobilises.

In-House SS Fabrication

Custom stainless steel benches, hoods, and pass-throughs fabricated in our own UAE workshop — no outsourced quality risk.

Post-Handover Training

Kitchen brigade walkthrough on zoning rules, grease-trap maintenance, and HACCP log protocols included with every project.

Process

Three structured stages take your brief from concept sketch to a fully inspected, staff-ready kitchen.

01

Brief and Survey

On-site measurement, menu-capacity analysis, and authority pre-check to confirm approval pathway before design starts.
02

Design and Submission

HACCP zoning plan, equipment schedule, MEP coordination drawings, and official municipality submission package delivered.
03

Install and Inspect

Equipment positioning, utility commissioning, grease-trap sign-off, and DM or Civil Defence final inspection managed end-to-end.

Good to Know

Answers to the questions restaurant owners ask us most.

1: What is the minimum kitchen size required by Dubai Municipality?
Make My Restaurant

Dubai Municipality mandates that the kitchen occupies at least 40% of the total restaurant area or a minimum of 28 square metres (300 sq ft), whichever is larger. Our designers confirm the exact threshold for your space category during the initial site survey and build this directly into the compliant floor plan submitted to DM.

2: Does your kitchen design include HACCP zoning and workflow planning?
Make My Restaurant

Yes. Every MMR kitchen design follows a mandated unidirectional raw-to-cooked workflow with physically segregated zones for raw meat, vegetable prep, hot cooking, and ready-to-eat plating. Dedicated handwash stations, double-bowl prep sinks, and separate entry and exit points are positioned to satisfy UAE Food Code and DM inspection criteria.

3: Do you handle ventilation and Dubai Civil Defence approvals?
Make My Restaurant

We design and size exhaust canopies, supply air systems, electrostatic precipitators, and carbon filters to meet Civil Defence specs — including chimney stacks that extend at least two metres above the nearest building line. Our drawings are prepared to CDD format and we coordinate the inspection appointment on your behalf.

4: How long does a commercial kitchen design project take in the UAE?
Make My Restaurant

Typically four to ten weeks from signed brief to approved DM drawings, depending on kitchen size and authority queue times. Fabrication and fit-out runs in parallel where possible. We provide a written milestone schedule at project kick-off so your restaurant opening timeline is never a surprise.

5: How much does a commercial kitchen design project cost in the UAE?
Make My Restaurant

A professional DM-compliant kitchen design package in the UAE typically starts from AED 5,000 for a basic 2D and 3D layout with MEP drawings, rising to AED 15,000-30,000 for full turnkey design, authority submissions, and site supervision. Costs vary by kitchen size, complexity, and the number of authority approvals required across different emirates.

6: Is a grease trap mandatory for restaurant kitchens in Dubai, and what size do you need?
Make My Restaurant

Yes. Dubai Municipality requires all commercial kitchens to route cooking drainage through a DM-approved grease trap before it enters the main sewer. For most restaurants, a 500-1,500 litre interceptor is standard; large hotel or catering kitchens may need 3,000 litres or more. Make My Restaurant sizes and coordinates grease trap installation as part of the full kitchen design package.

7: What stainless steel grade does Dubai Municipality require for kitchen surfaces and equipment?
Make My Restaurant

Dubai Municipality and HACCP guidelines specify SS 304 stainless steel as the minimum grade for work surfaces, prep benches, shelving, and fabricated hoods in commercial kitchens. SS 316 is recommended for wash-down areas and brine contact. Make My Restaurant fabricates all custom steelwork in-house to the correct grade, with mill certificates available on request.

8: Can you design a cloud kitchen or dark kitchen to Dubai Municipality standards?
Make My Restaurant

Yes. Cloud kitchens follow the same DM unidirectional workflow and zoning rules as full-service restaurants, but space optimisation is critical -- most shells are 28-60 sqm. We specialise in high-density cloud-kitchen layouts that maximise cooking stations, cold storage, and delivery dispatch flow within compact footprints while meeting all DM and HACCP requirements.

9: What happens if Dubai Municipality rejects the kitchen drawings?
Make My Restaurant

Rejections almost always stem from minor plan amendments or missing documentation rather than fundamental design failures. Make My Restaurant handles all resubmissions at no additional charge within the original project scope. Our pre-submission authority check -- conducted before drawings are formally lodged -- significantly reduces first-submission rejections for kitchens across Dubai, Sharjah, and the northern emirates.

10: Do you coordinate with MEP contractors, or does the owner hire them separately?
Make My Restaurant

We produce full MEP coordination drawings -- plumbing, drainage, LV electrical, gas risers, and mechanical ventilation -- as part of the kitchen design package. We can work with your existing MEP contractor or introduce one from our UAE fit-out network. Either way, our design team acts as the single technical reference point to prevent scope conflicts on site.

11: What is a HACCP-compliant unidirectional workflow and why does DM require it?
Make My Restaurant

A unidirectional workflow means food moves in one direction only -- from raw goods receipt through cold storage, prep, cooking, and plating to dispatch -- without backtracking through contaminated zones. Dubai Municipality mandates this layout to prevent cross-contamination between raw and cooked food. Our designs physically separate each zone with dedicated handwash points and zoned entry and exit doors.

12: Can Make My Restaurant redesign an existing kitchen that already has DM approval?
Make My Restaurant

Yes. Renovation or expansion projects require a new or amended DM submission, and we handle the full re-approval process. We start with an as-built survey, identify compliance gaps in the existing layout, and redesign around your new menu requirements. Partial kitchen upgrades -- such as adding a prep zone or upgrading ventilation -- are common scopes we manage across all seven emirates.

Get in Touch

Start Your Conversation

Reach us anytime — let's plan your restaurant.

    ×

    Loading...