Industrial Area 13, Sharjah & Al Saqr Business Tower, Dubai, UAE

Restaurant HVAC installation in the UAE means engineering separate climate zones for your kitchen and dining areas, balancing high-heat exhaust extraction with fresh-air makeup, all to Dubai Municipality, DEWA, and Civil Defence codes in a climate that peaks at 50 degrees C with coastal humidity above 90%. Make My Restaurant designs and installs complete HVAC systems for restaurants, cloud kitchens, and food courts across all seven emirates. From VRF multi-zone units and ducted split systems to commercial kitchen hoods with grease filtration and ecology units, our licensed engineers deliver fully commissioned, inspection-ready HVAC from day one so your team can focus on food, not temperature complaints.

Dual-Zone Climate Design

Separate engineering for high-heat kitchen exhaust and guest-comfort dining keeps both zones correctly pressurised and compliant.
Read More

VRF and Ducted Systems

We size and install VRF multi-zone, ducted splits, and package units to match your floor plan and peak UAE summer loads.
Read More

Kitchen Exhaust and Makeup Air

Canopy hoods, baffle filters, ecology units, and balanced makeup-air supply meet UAE Fire and Life Safety Code grease-extraction requirements.
Read More

DEWA and Code Compliance

All installations meet DEWA Green Building Regulations, Dubai Municipality, Civil Defence, and Al Sa'fat energy-efficiency benchmarks.
Read More

Why Choose Us

Make My Restaurant brings specialist F&B sector HVAC expertise to every project across the UAE.

UAE-Wide Coverage

Licensed teams in Dubai, Sharjah, and all seven emirates handle multi-site restaurant groups under one contract.

F&B Sector Specialists

We understand grease loads, odour control, and health inspection requirements that generic HVAC contractors routinely miss.

Energy-Efficient Systems

VRF inverter technology and ERV fresh-air units cut energy bills by up to 30% versus conventional constant-speed systems.

Turnkey and Inspected

We manage supply, installation, duct pressure testing, commissioning, and authority approvals so you open on schedule.

Process

Our three-step process takes you from empty shell to inspected, operational HVAC with no gaps.

01

Site Survey

Engineers calculate kitchen and dining cooling loads, fresh-air ratios, and hood sizing before specifying any equipment.
02

Supply and Install

Licensed technicians install ductwork, indoor units, hoods, filters, and controls to approved shop drawings.
03

Commission and Handover

We balance airflows, run authority inspections, and hand over as-built drawings plus an AMC option.

Good to Know

Answers to the questions restaurant owners ask us most.

1: What HVAC system type is best for a restaurant in Dubai?
Make My Restaurant

VRF multi-zone systems are the most popular choice for UAE restaurants because inverter-driven compressors modulate refrigerant flow to match real-time load, cutting energy use during partial-load periods. For larger food courts or hotel dining rooms, ducted AHUs fed by central chillers are often more economical. Make My Restaurant surveys your space and recommends the right configuration for your layout and menu concept.

2: Do restaurant HVAC installations in the UAE need Civil Defence approval?
Make My Restaurant

Yes. Commercial kitchen hoods, fire-rated ductwork, and grease-extraction systems must comply with the UAE Fire and Life Safety Code and receive Civil Defence clearance before you can open. Dubai Municipality and DEWA green-building checks also apply to the overall air-conditioning installation. Our team prepares all documentation and coordinates authority submissions on your behalf.

3: How is the kitchen ventilation different from the dining-area air conditioning?
Make My Restaurant

The kitchen operates under negative pressure with high air-change rates to exhaust heat, grease, and cooking odours through commercial hoods and ecology units. The dining zone needs positive pressure, lower velocities, and precise temperature control for guest comfort. Balancing these two zones correctly prevents cross-contamination of cooking smells into the dining area and is a key part of our design process.

4: How long does a restaurant HVAC installation take in the UAE?
Make My Restaurant

A typical 200-400 sqm standalone restaurant takes three to six weeks from approved drawings to commissioning, depending on fit-out sequence and authority approval timelines. Cloud kitchens with simpler layouts can move faster. We coordinate with your fit-out contractor to sequence HVAC first-fix, second-fix, and commissioning so your opening date is protected.

5: How much does restaurant HVAC installation cost in Dubai?
Make My Restaurant

Installed VRF systems for UAE restaurants typically cost AED 4,000 to AED 6,500 per ton of cooling, including ductwork and controls. A 200-seat restaurant may require 30 to 50 tons of total cooling capacity across dining and kitchen zones, placing the HVAC budget between AED 120,000 and AED 350,000. Exact cost depends on system type, duct complexity, and number of authority submissions required.

6: What fresh-air ventilation rate is required for a UAE restaurant dining area?
Make My Restaurant

ASHRAE 62.1, referenced in UAE Green Building Regulations and Al Saafat, sets minimum outdoor air at 7.5 cfm per person plus 0.06 cfm per square foot of floor area for restaurant dining. Dubai Municipality and DEWA compliance audits check that fresh-air handling units (FAHUs) meet these rates. Under-ventilated dining rooms generate odour complaints and risk adverse DM inspection outcomes during licence renewal.

7: Is an Energy Recovery Ventilator (ERV) required or recommended for UAE restaurants?
Make My Restaurant

An ERV or heat-recovery wheel is not mandatory but is strongly recommended and earns credit under Dubai's Al Saafat 2.0 Green Building scheme. In the UAE climate, pre-treating hot humid outdoor air through an ERV before it enters the AHU can reduce fresh-air cooling load by 50 to 70%, cutting DEWA electricity bills significantly and reducing compressor wear during the June-to-September peak.

8: What is the DEWA Green Building Regulation requirement for restaurant air conditioning?
Make My Restaurant

DEWA requires all commercial buildings, including restaurants, to comply with the Dubai Green Building Regulations, which mandate minimum energy performance aligned with ASHRAE 90.1 and Al Saafat 2.0 Silver rating. For HVAC this means minimum EER values for cooling units, heat-recovery on exhaust air, and demand-controlled ventilation in high-occupancy dining spaces. We produce an energy compliance statement as part of our DEWA submission.

9: Can a VRF system handle both the kitchen and the dining area in one installation?
Make My Restaurant

A single VRF outdoor unit can serve multiple indoor units across both zones, but the kitchen zone requires a separate exhaust-air strategy via commercial hoods rather than indoor VRF units, which cannot tolerate grease-laden air. We integrate the VRF for dining and back-of-house non-cooking areas with a dedicated kitchen exhaust and makeup-air system to ensure each zone is correctly pressurised and compliant.

10: What HVAC permits or NOCs are needed before installation can begin?
Make My Restaurant

In Dubai, MEP shop drawings must be approved by DEWA for electrical load and by Dubai Civil Defence for kitchen exhaust and fire-rated ductwork before any installation. Dubai Municipality reviews the overall food-facility layout. In free zones, Trakhees issues the mechanical NOC. In Sharjah, SEWA handles the electrical NOC. Make My Restaurant prepares and submits all documentation so no work begins before the required authorities have cleared the drawings.

11: How do you size a restaurant HVAC system to handle the extreme UAE summer heat?
Make My Restaurant

We perform a full cooling-load calculation using ASHRAE 2017 Handbook outdoor design conditions for each emirate -- Dubai design dry-bulb is 46 degrees C with 50% relative humidity. The load model accounts for solar gain through glazing, kitchen equipment heat output, occupancy density in the dining room, and makeup-air sensible and latent loads. Oversizing wastes capital; undersizing causes compressor failure by September.

12: Do you offer an Annual Maintenance Contract after the HVAC installation is complete?
Make My Restaurant

Yes. We offer a structured AMC starting from handover. The plan covers quarterly preventive visits including coil cleaning, refrigerant pressure checks, filter replacement, and drain-pan flushing, plus annual DEWA efficiency-compliance reporting. Restaurant clients on our AMC also receive priority emergency response across all seven emirates. Multi-site restaurant groups can bundle all outlets under one consolidated agreement.

Get in Touch

Start Your Conversation

Reach us anytime — let's plan your restaurant.

    ×

    Loading...